DOE Test Centre, Belfast

As part of the upgrading of the 15 DOE Test Centres in N.Ireland, PFT Systems undertook the installation of new floor finishes as part of an 18 month programme.  This contract was won because of our ability to met tight deadlines and work to high specifications and detailing.  

Project Requirements - Hard wearing to resist daily car and lorry traffic, slip resistant and easily cleaned and resist oils, fuels and other contaminants. New floors were required to last a min of 15 years.

Project Duration - Belfast DOE Test Centre 11th Sept - 17th Sept 2002 (Overall Project 15 Centres - 18 months) .

Project Size - 1200 m2 (Belfast Centre)

Existing Conditions - Install to both new and old concrete. 

Stages - There were 5 Stages

Stage 1 - Preparation
Stage 2 - Priming
Stage 3 - Apply 2nd Coat of Primmer
Stage 4 - Laying Floor Screed
Stage 5 - Apply Top Coat 

Materials Used - Remmers MT Primer, Remmers Viscacid Floor Mix Epoxy Screed & Acolan Sediment Resin Sealer. 


*to select another project click here*

Do you like the photographs, then why not view or download the movie of this project by clicking here

 

Old concrete floor 

Old floor around drain

Track blasting

Hand held grinding

Laying of floor

Sealing of floor

Finished floor around drain cover

Finished floor

 

:: PFT Systems Ltd : Unit 50-51, Armagh Business Centre, Armagh, BT61 7NH : ph: +44 (0) 2837511122 : fx: +44 (0) 2837511120 ::