Print
This Page
Curragh Camp, Curragh Resin Finish
Installation
of reinforced concrete floor slab to FM category 2 tolerances.
Later Application of resin floor finishes for a military vehicle maintenance
depot
Project Duration - 15th July - 13th Dec 2002
Project Size - 5500m2
Existing Conditions - Aprox 1500m2 old power troweled concrete. 4000 m2
new build
Stages - There were 5 Stages
Stage 1 - Installation of concrete floor slab
Stage 2 - Preparation
Stage 3 - Scratch coat primer
Stage 4 - Trowel applied epoxy and coloured quartz scatter
Stage 5 - Trowel applied epoxy seal coat
Materials Used - MC Durofloor (MC Dur 1205 & MC Dur 1202)
To
view pictures of the installation of the concrete at the
Curragh Camp, click
here
*to select another project click
here*
Do you like the photographs, then why not
view or download the movie of this project by clicking
here
|