Industrial flooring, bund, bund lining, chemical resistant flooring, anti-static flooring, concrete design and installation, airport runway maintenance, joint sealants, waterproof decking systems, waterproofing, basement waterproofing,  surface preparation, floor coatings, anti-slip, finishes, decorative, dustproofing, epoxy, epoxy paint, epoxy resin, epoxy floor coatings, polyurethane, screed and coating specialists copyright©2002 PFT Systems Ltd. all rights reserved.
 
Home Profile Services Projects News
Overview References Images Movies

Print This Page


Castle Junction, Belfast

Multi story car park requiring an elastic crack bridging wearing system to the upper decks and to decks at first floor level over retail shopping units.

Project Duration - 12th Apr - 20th Apr 2003

Project Size - 5500m2 

Existing Conditions - New power trowel concrete

Stages - There were 6 Stages

Stage 1 - Preparation 
Stage 2 - Priming
Stage 3 - Over banding to cracks and construction joints
Stage 4 - Apply elastic crack bridging waterproof layer
Stage 5 - Intermediate coating with cast on slip resistant aggregate 
Stage 6 - Top coat and yellow lines

 


*to select another project click here*

Do you like the photographs, then why not view or download the movie of this project by clicking here

1st waterproof coat applied 

2nd waterproofing coat being applied

Green paint being applied

Grey paint being applied

Finished car park deck

Finished car park deck

Finished car park deck

Finished car park deck

 