Industrial flooring, bund, bund lining, chemical resistant flooring, anti-static flooring, concrete design and installation, airport runway maintenance, joint sealants, waterproof decking systems, waterproofing, basement waterproofing,  surface preparation, floor coatings, anti-slip, finishes, decorative, dustproofing, epoxy, epoxy paint, epoxy resin, epoxy floor coatings, polyurethane, screed and coating specialists copyright©2002 PFT Systems Ltd. all rights reserved.
 
Home Profile Services Projects News
Overview References Images Movies

Print This Page


Distribution Warehouse, Belfast

Distribution warehouse with 9 metre high bay racking.  Laid at 300mm thickness.  Flatness specification is concrete societies technical report number 34 (Table 7.2R. 1997 FM2)

Project Duration - 20th Feb - 14th March 2003

Project Size - 1800m2 

Existing Conditions - traditional continuous tied reinforcement over pile caps. Work to be completed in 2 phases.

Stages - There were 5 Stages

Stage 1 - Preparation (Protection of internal finished block work. Fitting of isolation joint to stanchion and pipe work. Setting of levels with steel pins on top of pile caps.) 
Stage 2 - Pumping of concrete and the addition of super-plasticisers on site
Stage 3 - Screeding of concrete to preset levels
Stage 4 - Power trowel concrete and application of spray on acrylic sealer. 
Stage 5 - Testing of floor slab by independent experts (Face)

 


*to select another project click here*

Do you like the photographs, then why not view or download the movie of this project by clicking here

Preparation begins 

Protection of pipe work

Concrete pumping

Wide view of concrete pumping

Pumping of concrete continues

Ride on power trowelling of concrete

Finish view of concrete

Finish view of concrete

 