Welcome to the Project Images Section. Here you are able
to view images from a wide range of projects completed by PFT
Systems. The projects below include work from industrial
flooring screeds, epoxy paints, concrete installations, bund
lining, car park deck & waterproofing.
You can request a promotional CD which contains movies of
the above projects by clicking here
*To overcome long page loading times we have divided the work
images into the various projects*
The Projects (which are sorted by date) include;
|
|
Atlantic Harvest, Fanad Head |
|
New extension to large fish preparation factory in Fanad Head
Donegal. The client required a hard wearing, chemical
resistant and attractive floor, which was had to blend in
with existing floor installed by PFT Systems 6 years ago (20th
Oct 2006)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Musgrave Supervalu Centre, Kilcock |
|
New large distribution warehouse outlet (including
66 loading bays), requiring a high tolerance, jointless steel fibre
reinforced concrete slab with coloured shake on hardener,
which achieved FM2 Special category by FACE Consultants (1st
July 2004)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Davison's Cannery, Portadown |
|
New distribution warehouse outlet, requiring a steel fibre
reinforced concrete slab with coloured shake on hardener,
which achieved FM2 Special category by FACE Consultants
(1st March 2004)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Hanlon Transport, Dundalk |
|
An existing large storage facility requiring a polypropelene
fibre reinforced concrete slab, which achieved FM2
Special by FACE Consultants. 2,200m2 was completed in 1
day.
(26th Feb 2004)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Johnston's Transport, Armagh |
|
New distribution warehouse outlet, requiring a steel fibre
reinforced concrete slab with coloured shake on hardener
(20th Aug 2003)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Woodies DIY, Cavan |
|
New retail outlet, requiring a steel fibre reinforced concrete
slab on piles with coloured shake on hardener
(6th June 2003)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Nacco,
Portadown |
|
Installation of concrete utilizing the new Somero S240 laser
screed and Dramix steel fibres (9th May 2003)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
McKee's
Bakery, Maghera |
|
Installation of concrete floor slab and multi-colour
floor screed for new build facility (2nd May 2003) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Castle Junction, Belfast |
|
Installation of a waterproof decking systems for a
multi-storey car park. Followed by colourful painting of deck (16th April 2003) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Industrial Units, Drogheda |
|
Installation of concrete to a category FM 2 tolerance at
new build industrial units (3rd April 2003) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Distribution Warehouse, Belfast
|
|
Installation of concrete to a category FM 2
tolerance. Laid at 225mm thickness (14th March 2003) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
BMW, Belfast |
|
Upgrade of existing concrete floor for car maintenance area, car repair
bodyworks (14th Feb 2003) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Baileys, Mallusk |
|
The Diageo Group built a purpose made production & bottling
plant to supply their world market, requiring a no maintenance
chemical & heat resistant resin system. (8th
Nov 2002)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Irish
Army Camp, Curragh |
|
Dual package of concrete Installation high quality
resin finishes in 2 new large vehicle inspection areas (Resin
Installations - 1st Aug 2002) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Irish
Army Camp, Curragh |
|
Dual package of concrete Installation high quality
resin finishes in 2 new large vehicle inspection areas (Concrete
Installations - 1st July 2002) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
DOE Test Centre, Belfast
|
|
Upgrade of 15 DOE Test Centre in N.Ireland to Hard
wearing floors (11th Sept 2002) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
AIBP
Meats, Dublin |
|
New industrial flooring
systems (over tiles) using new materials from MC Chemicals
(20th Aug 2002) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Dargan Drive, Belfast |
|
Successful completion of wall and construction joints
(15th Aug 2002) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Misery Hill, Dublin |
|
New revolutionary waterproof spray system used
for first time in Ireland (24th July 2002) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Bramley Apples, Benburb |
|
New industrial flooring system installed to protect against malic acid.
This project seen the use for the first time of the new
revolutionary technique of power towelling a polyurethane
screed (12th
Dec 2001) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
City Airport, Belfast |
|
Installation of 20,000m2 of PQ quality concrete and airport
runway maintenance (18th June 1999)
|
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Seagate Technologies, Limavady & Springtown |
|
Seagate
Technology, Limavady & Springtown - Installation of anti static and chemical resistant floors, also
upgrade of bund linings (18th Aug 1997) |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
...click here
to see |
|
------------------------------------------------------------------------------------------------------------------------------------- |
|
Remember to check back next month to view
the next installment!! |
|

|